Energising Mankind, Worshipping MotherEarth ™
 
 
 

 
     
  Solar Power Generation Plants (REG™ KONARK) are 1 MW and above connected to the grid.  
     
Requirement
 
 
 
 
 
   
4-5 acres of land is required per MW of PV Power plant
A transmission / distribution substation (preferably near the site) for power evacuation
 
Schemes
 
JNNSM scheme: 25 years PPA
State policies
REC Scheme: REC certificates sold at exchanges as per the prevalent rates plus APPC tariff per unit generated
Captive / Open Access: Self consumption / third party PPA
   
Benefits
   
Long term PPAs backed by state / central utilities assure the investment returns
Accelerated depreciation of up to 90% on capital investment
Tax holiday (10 years with MAT*)
Third party PPAs can fetch attractive returns on rising tariffs
25 years of plant life with minimal operating costs
   
   
REN-EN-GENOffers :
   
Consultancy Services
   
Selection of best technology based on the location / application
Optimum planning and plant design
Best in class installation and commissioning practices
Project management & third party services
   
Project Financing
   
International funding at attractive terms
Liasioning activities with state / national utilities for permits / PPA
   
Engineering, Procurement & Construction
   
Selection of location
Engineering and designing of PV system
Installation and commissioning
O&M activities
   
Advantages
   
Life span 25+ years*
Payback period 3 to 5 years*
Low Operating Cost
Low Maintenance